Indiana Gratings Private Limited
RDSO Vendor Approval Details
Ownership Details
Mr. Prashant Hingorani
Mrs. Padma Govind Hingorani
Mr. Dharmakumar Mohanlal Bhatia
Registration / Incorporation
Certificate No: 11-105716
Date: 07 February 1997
MSME: UDYAM-MH-18-0441136
Memorandum & Articles: Defines company constitution, governance & shareholding.
Board Resolution: Authorized for RDSO participation & contract execution.
Addresses
Head Office:
8th Floor, A Wing, Indiana House, Marol Naka, Makwana Road, Andheri East, Mumbai – 400059
Factory:
C63 & D9 MIDC Jejuri, Taluka Purandhar, Pune – 412303
Contact
Name: Mr. Santu Mukherjee
Phone: 8976935741
Email: santu.mukherjee@indianagroup.com
Fabrication Units
Office and factory located at above addresses.
Manufacturing Facilities
Fabrication Shop
- Cutting, Drilling, Welding
- Max Cutting: 31500 × 3200 × 100 mm
- Straightening: 18000 × 2000 × 63 mm
- SAW Welding: 2000 mm
- 3 Axis Drilling: 51 mm dia
Blasting Shop
- D7 Plant: 0.751 Acres
- C63 Plant: 0.801 Acres
- Total: 1.55 Acres
- Painting Shed: 108m × 30m × 16m
Metallizing & Painting
Dedicated coating facilities available
Assembly & Stockyard
Full assembly & storage area available
Production Capacity
36,000 MT annually
RDSO Approval
Registration No: CBS/G/Reg/ Indiana Gratings
Quality Audits
- Last Audit: 05 Dec 2026
- Next Audit: 05 Dec 2031
Factory Licenses
- C63 Plant: 122102599900656
- D9 Plant: 122102816200653
ISO Certification
- ISO 9001 – TUV Nord
- Date: 10 May 2025
- Surveillance Audit: 24 Feb 2026
- Internal Audit: 16–22 Apr 2026
Testing Facilities
- In-house: Physical, Chemical, Mechanical
- DPT (In-house)
- UT / RT (Outsourced)
- NABL Approved
- ASNT Level III Personnel
Technical Team
- B.Tech Mechanical
- ASNT NDT Level III
- EN ISO 9712 Level II
- CSWIP 3.1
- Lean Six Sigma Black Belt
- Experience: 28 Years
Power Capacity
- C63: 478 KVA / 788 KW
- D9: 572 KVA / 1080 KW
Projects Executed
- Mukund Bridge (2021) – 412.385 MT
- Mumbai Metro (2022) – 77 MT
- Guntakal Division (2023) – 368 MT
- Ghorpadi Project (2023) – 220 MT
- Mumbai Metro Line 2B (2024) – 325.24 MT
- Mumbai Metro Line 2B (Railway Span) – 388.13 MT
Ongoing Work
MRIDCL Road Over Bridges (Maharashtra)
6 Spans | 661.620 MT | 2025–2026
